Mon-Fayette Expressway keeps growing
Add Axios as your preferred source to
see more of our stories on Google.

Illustration: Brendan Lynch/Axios
The controversial Mon-Fayette Expressway, sometimes called the zombie highway, is growing again, nearly satisfying its insatiable hunger.
Why it matters: Decades in the making, the Mon Valley's toll road will open a new section this week with the final goal of connecting all the way to the Parkway East in Monroeville.
The latest: The Mon-Fayette Expressway, aka State Route 43, is scheduled to open a 3-mile extension from Clairton Boulevard (Route 51) in Jefferson Hills to Camp Hollow Road in West Mifflin at around 10:30am Friday.
Zoom in: The new stretch extends north of Route 51, passing by Clairton to its east and then bearing northwest for a section to go around the Irvin Works U.S. Steel facility along the Monongahela River.
Zoom out: The extension will add to the 54-mile length that traverses through the Mon Valley, passing by Brownsville and Uniontown on the way to its terminus outside of Morgantown, West Virginia.

Follow the money: $1.3 billion is needed to connect the Mon-Fayette Expressway all the way to Monroeville.
- This section cost $214 million, per the Turnpike Commission.
By the numbers: About 4,300 vehicles a day drive between Jefferson Hills and Finleyville, the most northern section of the Mon-Fayette, per 2025 PennDOT data.
- That's similar to how many drivers use the Parkway North every hour during the day, according to the Post-Gazette.
State of play: Supporters have long believed the road was key to boosting the Mon Valley's struggling economy by giving it better trucking access to its neglected industrial sites.
Yes, but: Critics have labeled the Mon-Fayette Expressway the zombie highway because, despite its massive cost and low ridership, the project can't be killed.
Flashback: Originally proposed in the 1950s to connect steel towns together, the Mon-Fayette Expressway opened its first section in 1977.
- Limited funding in the early '80s stalled expansion, and then the local steel industry collapsed and there was less need to connect steel facilities.
- Funding resumed in the late '80s, and expansion continued from 1990 through 2012 before picking back up again recently.
If you go: The toll between Route 51 and Camp Hollow Road will cost $0.97 for E-ZPass customers and $1.94 for Toll By Plate users for standard vehicles.
- Driving the entire 57-mile length costs over $11 for E-ZPass customers and over $24 for Toll By Plate users.
Ryan's thought bubble: The Mon-Fayette Expressway probably won't achieve all the goals of its supporters, nor all the failures of its critics, but it might help alleviate congestion by allowing vehicles to bypass the Parkway East to reach the airport.
What's next: Another 1.5-mile stretch from West Mifflin to Pittsburgh-McKeesport Boulevard in Dravosburg is under construction and is expected to finish by late 2029, per PennDOT.
